Graduate Hotel President David Rochefort Presents Overview Of Roosevelt Island Cornell Tech Hotel – Opening Planned For Summer 2020, Rooftop Bar And Ground Floor Restaurant Operator To Be Named Shortly, Local Job Fair In Early 2020
During the November 12 Roosevelt Island Cornell Tech Community & Construction Task Force meeting, we learned that the 18 story, 224 room Graduate Hotel,
Image From November 12 Task Force Meeting
with a ground floor restaurant and rooftop bar, currently under construction
Image From November 12 Task Force Meeting
will open in the summer of 2020 (The adjoining Verizon Executive Education Center is scheduled to open in the Spring of 2020).
Image From November 12 Task Force MeetingGraduate Hotel President David Rochefort presented an overview of the Hotel Project to the Task Force.
Mr Rochefort reported:
Here’s full Task Force discussion with the Graduate Hotel President David Rochefort.
Prior to Mr. Rochefort, speaking Cornell Tech Director of Design and Construction Diana Allegretti described construction of the Graduate Hotel.
Stay tuned. More info on the Roosevelt Island Cornell Tech Graduate Hotel to come.